The Word on The WORD
Buffalo 05/26/2009
Finally, today we met with the tower crew at the HSBC building in downtown Buffalo. They will be taking all the required specifications of the tower and antennae. We will then make an engineer’s drawing or GDT (Geometric dimensioning and tolerance) and submit it to the appropriate zoning board so that we can obtain our construction permit. Please continue to pray for the Lords perfect will and timing. Thank you.
Buffalo
On Tuesday April 14th, our Engineer met with the Telecommunications Zoning Board to enquire about our translator application to build on top of the HSBC building in downtown Buffalo. We have finally obtained the information regarding what we must do to gain approval from the board. We have been in contact with the tower crews and they are happy to help us with this venture. We will be sending a team to "spec-out" the tower and obtain an engineer’s drawing or GDT (Geometric dimensioning and tolerance) of the tower and our antennae and demonstrate to the board that it will endure sustaining winds of some 90 plus mph. Please, continue to pray. This battle is not over, there are over six hundred thousand souls at stake here and you know full well our adversary is not happy about the prospects. Thank you for all of your prayers already and all of your financial gifts, you are a major player in this ministry and you are the reason we are here. Lord Bless.
Copyright 2006-2009 Calvary Chapel of the Finger Lakes